Rihanieh

Supply and installation of a hybrid PV and wind back-up micro power plants and energy efficiency sets –in Rihannieh Public School, Chebaa Secondary Public school, DeirElAhmar Public School &Aarsal Telecom Outpost. (UNDP/Cedro), Energy Yield: 50Mwh/year

Wind Project- Amiq Bekaa

Projects Gallery \ Wind Project- Amiq Bekaa BGF Stand Alone Wind Turbine (2002) 350KVAp stand alone wind turbine in Amiq-Bekaa to supply BGF game farm with power mainly used for irrigation. Asaco was the local partner and contributed in the installation and adaptive design with Imtech-Vonk of the Netherlands as well as maintenance to date.…